EN - 7
PP Plus 36D/401D
4 Putting into operation
4.3.1 Liner
To be used for steel wires.
1
Lay down the cable assembly
straight and unscrew nut
from central
.
2
Slide the liner
through the wire conduit
is felt in the inlet nipple
3
Determine excess length x and pull out the liner
again.
4
Shorten the liner
by the dimension x.
5
Debur the cutting point and sharpen the spiral beginning to an angle
of 40°.
6
Insert the liner cut to length
into the wire conduit
7
Screw down nut
and secure with multiple wrench
.
1
Torch neck
2
Inlet nipple
3
Wire conduit
4
Central connector
5
Multiple wrench
6
Nut
7
Holding nipple
8
Liner
9
Cable assembly
Fig. 3
Liner
40°
x
4 – 5 mm
1
2
3
4
5
6
7
8
9
NOTE
• Mount the liner
pressing it slightly.