P a g e
|
15
ABEM WALKTEM 2 ABRIGDED USER MANUAL
9.
MEASUREMENTS
10.
FILE MANAGEMENT & INVERSION
A.
All that is required on this page is to
press
“
Start
”
. This will initiate the cycle
of noise, low moment and high
moment measurements.
A progress bar will indicate how far
into the measurement process you are
and an estimation of time remaining.
The instrument has both audio (for
which the supplied Bluetooth speaker
is required) and visual notifications
that the measurement is complete.
B.
Use the TAB button to select the first tab
above the data plot on the right-hand side
of the screen. The left and right arrow will
now switch between the different real-time
measurement views.
•
ChA-All and ChB-All will redraw the curve each
time a new High Moment, Low Moment or
Noise measurement is made on Channel A and
B, respectively.
•
In the example here, only the RC-5 is being used
and thus ChB feeds are not available to view.
•
The remaining tabs show only one of the
measurement phases (High, Low or Noise) for
each channel. These refresh the next time one
of these measurement phases are completed
A.
Use the Down Arrow to select a
project.
The Right Arrow will expand the
‘
tree
’
to show soundings (Stations) measured
within that project.
The Menu button ( ) will give a series
of file management options for the
Project or the Station depending upon
which is highlighted.
Some of these actions have shortcut
keys listed on the right of the screen.
To use the
“
Export
”
options, a USB
drive will need to be attached to the
instrument.
A