![Abbott CELL-DYN 3200 System Operator'S Manual Download Page 86](http://html1.mh-extra.com/html/abbott/cell-dyn-3200/cell-dyn-3200_system-operators-manual_450985086.webp)
2-10
CELL-DYN
®
3200 System Operator’s Manual
9140181H—October 2001
Installation Procedures and Special Requirements
Tubing Installation
Section 2
Figure 2.6 Tubing in a Normally Closed Valve
4. When the tubing has been installed properly, it should move back and forth
freely.
5. Confirm that
both
ends of the diluent tubing are firmly attached to the
connectors.
6. Repeat steps 3 through 5 until the tubing has been inserted in all six of the
Normally Closed Valves.
Flow Panel and Syringe Inspection
1. Inspect the Flow Panel components for obvious damage and to ensure the
tubing is properly positioned under all solenoid pinch valves.
2. If there is any damage, contact the Abbott Hematology Customer Support
Center.
3. When the inspection of the Flow Panel is completed, turn the Main Power
Switch to
ON
.
4. Before putting the front covers and skirt back on the instrument, run several
background counts (by pressing the Touch Plate) to observe proper
functioning of the instrument. Check for leaks, crimps in the tubing, and the
opening of the Solenoid pinch valves. Observe the operation of the syringes.
The syringes should move freely up and down with no evidence of air
bubbles.
5. If no problems are detected, close the Left and Right Front Covers and press
into place. Reattach the Tower Cover and press into place (for the SL model,
line up the two holes on the bottom of the cover with the two pins on the
Sample Loader molding). On the CS model, reattach the Front Skirt using the
four Phillips-head screws. On the SL model, lift up and slide the Sample
Loader forward using the center guide to properly align the loader with the
Analyzer. Secure the loader by tightening the four Phillips-head screws.
1 Tubing
2 Slot
3 Valve
4 Connectors
1
2
3
4
4