![Abbott CELL-DYN 3000 Troubleshooting Manual Download Page 151](http://html1.mh-extra.com/html/abbott/cell-dyn-3000/cell-dyn-3000_troubleshooting-manual_3323084151.webp)
28 Oct
1997 21:57
CELL-DYN
®
3/35 Sample Loader TS Guide
9140234B-June 1997
VERIFICATION PROCEDURESVP - 3.4 Rack Clearance Check
3 - 26
3
VP - 3.4 Rack Clearance Check
Purpose: Perform this procedure to verify clearance between Rack and Beam Block,
.
1. Check Clearance of Rack at Beam Block (
).
2. If Check is OK, go to
“VP - 3.6 X-Axis Solenoid to Guide Rod Check” (Page 3-31)
.
3. If Check Fails, go to
“VP - 3.5 Rack Clearance Adjustment” (Page 3-28)
Special Tools
DESCRIPTION
QTY
PN
Feeler Gauge Set
1
1-43627-01