background image

Summary of Contents for aim

Page 1: ...T 6 aim ABBOTT aim plus Technical Service Manual For use with the following list numbers 13038 04 Abbott AIM 13967 04 Abbott AIM Plus ABBOTT LABORATORIES NORTH CHICAGO IL 60064 USA 430 600035 002 Rev...

Page 2: ...proprietary information Abbott Laboratories retains all the exclusive rights of dissemination reproduction manufacture and sale Any party using this document accepis it in confidence and agrees not t...

Page 3: ...pump inspection checklist to match current service training 2 Added alternate PVT procedures for performing the motor test servo calibration encoder test and current supply test without a torque brak...

Page 4: ...Changes 430 600035 002 Rev 11 99 This page intentionally left blank AIM AIM Plus Technical Service Manual...

Page 5: ...9 4 3 1 10 4 3 1 11 Microprocessor CPU EPROM o Microprocessor Supervisory Circuit RAM Time Of Day Clock Display Encoder Interface Circuit Backup Microprocessor Keypad Interface Bolus Switch Interface...

Page 6: ......

Page 7: ...74 Pump Reassembly Procedure o 7 4 1 Alternate Assembly instructions for RTV Sealing 75 Back Case Assembly 7 5 1 AIM Beeper 7 6 Optics Assembly 7 7 Motor Assembly 7 8 Latch Assembly 7 8 1 Latch Sprin...

Page 8: ...Contents Section 8 Specifications Section9 Drawings 430 600035 002 Rev 11 99 vi AIM AIM Plus Technical Service Manual...

Page 9: ...ation 7 12 Figure 7 12 Optics Carrier to Motor Frame 7 13 Figure 7 13 Motor Assembly to Motor Frame 7 14 Figure 7 14 Latch Assembly to Motor Frame 7 15 Figure 7 15 PCB Front View 7 17 Figure 7 16 Fron...

Page 10: ...Figures 430 600035 002 Rev 11 99 This page intentionally left blank viii AIM AIM Plus Technical Service Manual...

Page 11: ...us Alert Messages Table 6 2 AIM AIM Plus Alarm Codes 001 007 Table 6 3 AIM AIM Plus Alarm Codes 008 143 Table 6 4 Servo Calibration Failure Codes Table 6 5 Troubleshooting o Table 6 6 AIM AIM Plus Por...

Page 12: ...Tables 430 600035 002 Rev 11 99 This page intentionally ieft blank AIM AIM Plus Technical Service Manual...

Page 13: ...ts Section 6 Troubleshooting Section 7 Replaceable Parts and Repairs Section 8 Specifications Section9 Drawings Note In this manual the terms pump and pumps refer to all configurations of both the AIM...

Page 14: ...ure accurate fluid delivery The pump detects occlusions and air in the fluid cartridge Ifthe pressure at the cartridge exceeds the specification occlusion alarm pressure the instrument sounds an alarm...

Page 15: ...ound The AIM and AIM Plus have the following significant software differences Table 1 2 AIM and AIM Plus Software Differences Item Significant AIM Plus Differences Air Alarm Sensitivity Air alarm can...

Page 16: ...LIZE NVRAM OR USE ARROWS display returns Throughout this manual warnings cautions and notes are used to emphasize important information as follows WARNING A warning contains special safety emphasis an...

Page 17: ...t has been misused damaged altered or used other than in accordance with product manuals so as in Abbott s judgment to affect its stability or reliability or in the event the serial or lot number has...

Page 18: ...M Plus kit Insert a copy in this binder s pockets for convenient reference Ifa copy of the System Operating Manual is not available contact Abbott Laboratories Technical Support Operations see Section...

Page 19: ...ies Front case assembly AC power jack assembly Bolus jack assembly Displa module Mylar Washer Battery door Motor frame seal Motor frame with optics assembly motor assembly and latch assembly PCB assem...

Page 20: ...using specially designed equipment for that reason replacement of the motor frame must be performed by Abbott Laboratories The mechanical drive consists ofa motor assembly refer to Figure 4 3 Motor As...

Page 21: ...optics carrier In order to function correctly all four optics surfaces must be kept clean and free of scratches which could impede light transmission Top view Bottom view Flow direction Occlusion LED...

Page 22: ...he occlusion phototransistor is off The check cartridge alarm utilizes the same phototransistor sensor as the occlusion alarm A check cartridge alarm is displayed whenever the lightpath is interrupted...

Page 23: ...r interfaces to the keypad and other devices via port lines The motor drive circuit regulates motor speed by maintaining a constant back EMF across the motor The drive circuit has the capability of ei...

Page 24: ...98181 po ee VOSSO pur dy tendo ANO ION MTT jedesg Addng Jamo TROIE DIE 98 Alddng 4emog 1x3 290 Jewod A09 siojenbay g pue JBMO PUR E 79040 PC Ji9AU0O 100008 VAT Asa LI use Ozal NIV 769005464 0000 9010...

Page 25: ...biases the inverter for operation in a linear range and C17 and C16 provide the correct loading and phase shift to maintain stable oscillator operation Resistors R116 and R117 pull up the MODA and MOD...

Page 26: ...source for the RAM U14 and time of day clock U20 Whenever VDD drops below BT2 battery voltage the VOUT switches power from the VDD source to BT2 source The final function of U21 is to provide a power...

Page 27: ...low AS is high and A6 through A11 are low giving an effective address of 1020 1021 for the display The backlight to the display is enabled by driving Q6 on U9A serves as a 3 3V to 5 0V translator to...

Page 28: ...ed with software to the clockwise pulse from the encoder interface circuitry to detect most encoder or circuit failures Most of the port lines are utilized to interface with peripherals such as the ke...

Page 29: ...of the 2 1 divider R30 R33 A D input PE6 monitors the voltage of the 8V supply as provided by voltage divider and filter R32 R12 and C11 This input should read full scale FF for a 9 9V supply voltage...

Page 30: ...long periods as the capacitors are discharging These intermediate state inputs could cause high supply current drains similar to the condition of floating inputs 4 3 2 2 Audible Alarm The audibie ala...

Page 31: ...ransistor U27A is driven ON At the same time the output of U25A goes low to approximately 5 0V thus driving P channel MOSFET U28 ON U25A serves as a voltage level translator converting the 0 to 5 0V s...

Page 32: ...unt to maintain the speed of the motor constant As the output voltage of U23B increases the output voltage of U23A decreases forcing the output drive voltage to the motor to a higher level The MTR_ON...

Page 33: ...verify proper pump operation after any repair or replacement of pump assemblies or components Qi Preventive Maintenance As part of a preventive maintenance schedule it is recommended that the PVT be...

Page 34: ...o not use abrasive cleaners or materials on the pump Using abrasive cleaners or cleaning solutions not recommended by Abbott Laboratories may result in product damage CAUTION To avoid pump damage clea...

Page 35: ...re disinfectants check the product labeling CAUTION Do not sterilize by heat steam ETO or radiation as these methods may cause the pump to malfunction Clean the cartridge channel on a regular basis Us...

Page 36: ...el is intact Inspect to verify presence of closure hardware Verify presence and legibility of operating and serial number labels Motor Frame Assembly includes Optics and Latch Assemblies Verify motor...

Page 37: ...confirm a connection to the adapter box Remove the batteries Connect the AC power adapter to the power jack Verify that the connector fits firmly into the power jack Slide the ON OFF switch to ON and...

Page 38: ...res motor turns or through a wet test that measures fluid delivered U Optics Test Verifies correct operation of the optics by generating occlusion and air in line alarms A Current Supply Test Verifies...

Page 39: ...ble for Seiko or Kodak printers if printout of electrical test desired Cartridge housing for use with turns counter and current supply test AC power supply list 13586 if desired for 24 hour burn in te...

Page 40: ...block into the pump s battery compartment battery door only partially closes over inserted block 4 Insert barrel plug from battery substitution block into BATT BLOCK jack on the microbox 5 Attach barr...

Page 41: ...S XM DDD MMM DD YY KEYPAD CHECK RELEASE KEY TIME IS XM DDD MMM DD YY ENTER THE LOCK SEQUENCE NUMBER KATA 5 3 2 4 Selecting the Final ATP Test 01 VERSION 02 CLEAR EXT RAM 03 CLEAR ERR LOG USE FOR MORE...

Page 42: ...Press NO to exit when the clock is correct If using the PVT Form record the results Press YES to indicate PASS and go to the next test NO to exit the FINAL ATP Acceptance Test Procedure or press BACK...

Page 43: ...UP to repeat the test Use the arrow keys to increase and decrease the voltage Verify that the screen fades as the voltage increases Press CHANGE to set the contrast to 0 04V manufacturer s recommendat...

Page 44: ...ER Then on top of the pump press BOLUS once then insert the remote bolus cord and press the button on the cord Cf no remote bolus cord is available press BOLUS twice Press and hold NO for approximatel...

Page 45: ...Manual PLEASE WAIT will display while the pump performs the battery check PRESS NO TO EXIT appears when the check is complete Verify the ALK reading is 4 60 5 16V Verify the LITH reading is 2 79 3 50V...

Page 46: ...tion of the Optics Check requires an optics test block If an optics test block is not available press NO to exit then YES to go to the next test Test Setup refer to Figure 5 3 Optics Test Block Placem...

Page 47: ...ress NO to exit Remove the test block If using the PVT Form record the results Press YES to indicate PASS and go to the next test NO to exit the FINAL ATP or press BACK UP to repeat the test The pump...

Page 48: ...es from down to up and that the beeper sounds continuously While the beeper is on press OPTIONS and verify that the beeper volume goes up and down as the duty cycle runs between 0 50 Press OPTIONS aga...

Page 49: ...row to increase PW1 to 230 Verify that the motor speed increases smoothly and that the shaft is turning clockwise Press 3 to disable 6805 Verify that the motor turns off Press 6 to enable 6805 Verify...

Page 50: ...o Section 6 3 3 Servo Calibration Failure Codes for troubleshooting information Verify the following readings MD 50 75 minimum duty cycle LR 25 lowest rate ILO 200 450 minimum current with torque brak...

Page 51: ...the primed set into the mouth of a 20 mL graduated cylinder ENCODER TEST 0 0mL INFUSED PRESS START PRESS NO TO EXIT RATE mL hr 20 0mL INFUSED TIME 179 sec PRESS NO TO EXIT ENCODER TEST YES PASS NEXT N...

Page 52: ...rvice Test Mode menu press 1 7 to enter the PRINTER TEST The pump will send a copy of the character set to the printer Verify the printout reads as follows PRINT TEST START ABCDEFGHIJKLMNOPORSTUVWXYZa...

Page 53: ...therapy 2 PAIN MANAGEMNT 3 INTERMITTENT USE FOR MORE 1 INTRAVENOUS Press 2 to select epidural mode EPIDURAL 3 SUBCUTANEOUS N H CONTINUOUS Press 2 to select bolus only delivery BOLUS ONLY 3 CONT BOLUS...

Page 54: ...S ELIMINATING FILTER YES OR NO PROGRAM Press and hold the down arrow key to scroll through the program REVIEW parameters until the review is complete USE M FOR MORE At the last screen press ENTER to e...

Page 55: ...D DELIVERING LOADING DOSE 1 1 AIM AIM Plus Technical Service Manual In the stop mode press START Press YES to begin delivery of the Loading Dose Verify that the motor begins turning clockwise and that...

Page 56: ...US N F CONTINUOUS BOLUS ONLY 3 CONT BOLUS N F SELECT mg mL SELECT ug mL 3 SELECT mL N SET RATE 0 0 mL hr ENTER WHEN DONE PROGRAM A LOADING DOSE YES OR NO SET BOLUS DOSE 0 0 mL ENTER WHEN DONE 430 6000...

Page 57: ...t a 100 mL container size Press 1 to select high air sensitivity Press YES Press and hold the down arrow key to scroll through the program parameters until the review is complete At the last screen pr...

Page 58: ...flashes and the alarm sounds If using the PVT Form record the results Press SILENCE to quiet the alarm Press STOP to return to the stop mode Clear the occlusion by removing the clamp from tubing Remo...

Page 59: ...echnical Service Manual Press YES Press PRIME Section 5 Maintenance and Service Tests Follow the instructions on the display to prime approximately 1 0 mL to clear the air alarm If necessary refer to...

Page 60: ...in load to the motor shaft A dry or wet set may be used as a substitute for the torque brake If torque brake is used install the cartridge housing on the motor frame to defeat the occlusion and check...

Page 61: ...reading on the DMM is 75 mA or less 1 mV 1 mA Ifusing the PVT Form record the results Turn the power switch off allow the pump to power down completely and remove the battery substitution block Disco...

Page 62: ...ly batteries are in use the following display appears USING BATTERIES Press ENTER ENTER TO CONFIRM CURRENT THERAPY Press NO to enter a new therapy PAIN MGMT EPIDRL USE CURRENT YES OR NO 1 TPN Press 5...

Page 63: ...rogram review In the stop mode press START to begin delivery Allow the pump to run for 16 hours The ALMOST EMPTY alarm sounds approximately 30 minutes before the 16 hour period elapses Press SILENCE t...

Page 64: ...to complete successfully Otherwise proceed to the next step 01 VERSION 02 CLEAR EXT RAM 03 CLEAR ERR LOG USE FOR MORE Press 0 3 to select CLEAR ERR LOG CLEARING The pump clears the error logs As the t...

Page 65: ...Check Display Test ALK 4 60 5 16V LITH 2 79 3 50V Idle Current DMM 30 mA or less Optics Check AIR 231 255 OCCL 231 255 Optics Check II AIR 14 to 40 OCCL 12 to 40 Clearing Memory Beeper Test Duty Cycl...

Page 66: ...20 2 mL Print Test Results attach printout Printer Test attach printout Delivery Test Dry Test or Wet Test circle one Dry Test Turns Counter Reading 9 95 to 10 05 mL mL Wet Test Delivered Volume 19 0...

Page 67: ...for assistance 6 2 Setting February 29 on Leap Years During normal operation all Abbott ATM and ATM Plus infusion devices will automatically rollover to February 29 on leap year However on February 2...

Page 68: ...orrect time and date 6 3 Troubleshooting Tables The following tables are provided to assist in troubleshooting problems with the pump If problems require component or assembly replacement refer to Sec...

Page 69: ...complete in 30 minutes Press SILENCE to mute for ten or less minutes For bolus only program delivery will Note This alert does not occur with complete during next bolus delivery TPN Intermittent or V...

Page 70: ...g the pump to use refer to Section 5 3 Performance Verification Test The alarm log and pump software versions can be reviewed and printed through the Alarm Log feature of the Options Menu refer to the...

Page 71: ...ge in pump If alarm will not clear refer to page 6 18 7 in Table 6 5 Troubleshooting Press SILENCE to clear Press START STOP or SILENCE to clear Check for secure AC connection and restore AC power as...

Page 72: ...otor shaft is turning If the shaft is not turning Change cartridge then press START If alarm does not reoccur it has been cleared If alarm reoccurs check motor drive circuit at J11 pin 1 for voltage I...

Page 73: ...14 SPEED CALC Motor speed Change cartridge then press START If alarm does not voltage current reoccur it has been cleared error If alarm reoccurs check for incorrect motor voltage R58 R73 etc or curre...

Page 74: ...next IRQ 103 XIRQ OVERLAP XIRQ did not complete before next XIRQ 104 CCW COUNTER Counter clockwise encoder interrupt did not complete before next interrupt 105 CW COUNTER Clockwise encoder interrupt d...

Page 75: ...EAR ERR LOG Power off wait one 6811 RAM error minute then power on again If alarm does not 110 MAIN STACK Main reoccur it has been cleared 6814 stack If alarm reoccurs check CPU U19 overfiow For code...

Page 76: ...ridge Power off wait one minute then 119 MOT VOLT ERR Voltage presenton power on again to clear alarm If alarm does not reoccur it motor when it has been cleared should be off If alarm reoccurs check...

Page 77: ...thout recalibrating the motor or lithium battery BT2 has failed Use the software diagnostics to check lithium battery voltage If voltage is within specification recalibrate motor as follows Power off...

Page 78: ...by the user moving the motor shaft when microprocessor the pump is in the stop mode e g when changing the 6805 motor turning cartridge Power off wait one minute then power on again when it should be...

Page 79: ...processors Power off wait one minute then power on to reset the communication interface if alarm reoccurs power off the pump and access the test mode as described in Section 5 3 2 3 Entering the Serv...

Page 80: ...Test Mode Select 02 CLEAR EXT RAM then 03 CLEAR ERR LOG Power off wait one minute then power on again If alarm does not reoccur it has been cleared If alarm reoccurs check address or data pins on CPU...

Page 81: ...Check for presence of E clock replace CPU U19 EPROM U15 Check for bad contacts on U15 or associated socket replace U15 Solder joints on U14 or U14 Check soldering Resolder joints or replace U14 2 No d...

Page 82: ...associated components No voltage or too low a voltage at U23 7 output causes too slow a motor speed replace components as necessary U24 Verify that U24 6 pulses whenever U24 7 is less than 1 3V approx...

Page 83: ...r as required Connections from board to motor Repair connections as required No encoder power Check U10C or 04 No encoder strobe Check for strobe pulse 6 OCCLUSION or CHECK Q11 shorted collector to Re...

Page 84: ...totransistors when cartridge is in place and no occlusion is present Check A D for proper operation Replace optics assembly as required AID of CPU Replace U19 AID reference from CPU Check R115 C43 and...

Page 85: ...D drive to be too high R59 shorted Replace R59 Air phototransistor or wiring Repair wiring or replace optics assembly Microprocessor Replace U19 10 Timer does not keep time Crystal Y2 or timer chip U2...

Page 86: ...e pump access the test mode as described in Section 5 3 2 3 Entering the Service Test Mode Select 08 MOTOR TEST Complete the test as described in Section 5 3 2 18 Motor Test and confirm that the readi...

Page 87: ...rial data input to main CPU PD3 Master out slave in serial data output from main CPU PDA Serial clock from main CPU for SPI bus PDS Unused PEO Analog input to CPU from optical air detector FS 3 3 V mi...

Page 88: ...up CPU to signal communications is ready PAX6 Output from CPU to turn on AA alkaline battery test circuit and apply load to battery 1 ON PAX Battery test circuit control 1 ON PBXO Output from CPU for...

Page 89: ...for transmitted RS 232 data PDX2 Master in slave out serial output from backup CPU PDX3 Master out slave in serial input to backup CPU PDX4 Serial clock input to backup CPU PDX5 Slave select 0 puts b...

Page 90: ...c 26A 2 B3 2B 1 B5 11B 3 B6 26B 2 B3 2C 1 B5 1B 3 B6 26B 2 B3 2D 1 B6 11D 2 B4 26C 2 B3 2E 2 C7 12A 1 B6 27A 2 D3 2F 3 G 12B 1 BS 278 2 D2 3 3 05 12C 1 B5 28 2 D4 4 3 B3 12D 1 BS 30A 2 B6 6 3 D3 13A 3...

Page 91: ...us IC Location Codes IC U Schematic IC U Schematic ICU Schematic Sheet Section Sheet Section Sheet Section 106 3 AS 24 2 D5 35D 2 C2 10D 2 C6 25A 2 C4 10E 2 A4 25B 2 C3 10F 2 B3 AIM AIM Plus Technical...

Page 92: ...used to scroll through the menu but an item can be selected at any time by entering the test number Power off the pump to exit the Service Test Mode 01 VERSION 02 CLEAR EXT RAM 03 CLEAR ERR LOG 04 CLE...

Page 93: ...ce insert a copy of the Spare Parts Price List here Safety Precautions Before opening the front enclosure of the infusion system take all necessary precautions for working on high voltage equipment WA...

Page 94: ...of the back case 3 Remove all the screws on the back case Through the hole in the back case created by removing the screw in the upper left corner remove the smaller screw that connects the motor fram...

Page 95: ...way from the unit 6 Disconnect the battery connector cable bolus jack and AC power jack pins from the circuit board refer to Figure 7 2 Front Case Connections 7 Disconnect the number function and bolu...

Page 96: ...ections For further repair instructions regarding the optics motor and latch assemblies refer to Section 7 6 Optics Assembly Section 7 7 Motor Assembly and Section 7 8 Latch Assembly For further repai...

Page 97: ...to Section 7 5 Back Case Assembly g 2 66 x 3 16 inch ot pan head screws 2 PCB assembly 2 56 x 3 16 inch m pan head screws 2 PCB assembly AIM Plus Back case assembly AIM back case assembly 5548 50 Figu...

Page 98: ...bly 2 56 x 3 16 inch fil head screw 1 x Mylar washer 2 Motor frame seal 2 56 x 3 16 ingh pan head screws S J13 to battery conn J6 to power jack ON Ji to bolus Jack ZN PCB assemblyX i Back case assembl...

Page 99: ...7 2 Front Case Connections To install the display module and each keypad unlock the appropriate connector on the PCB by pulling up the locking bar insert component end into connector without twisting...

Page 100: ...g two 2 56 x 3 16 inch pan head screws refter to Figure 7 4 AIM and AIM Plus PCBs to Back Cases Tighten Screws 4 Layasecond bead of RTV across the board at the top of the printer port to seal all gaps...

Page 101: ...nspect to ensure that there are no voids or gaps in the seal RTV these edges of motor frame seal before installation 5D 21 25 Figure 7 9 Motor Frame Seal 9 Make the following electrical interconnectio...

Page 102: ...ctor Push down on the top case then tum the pump over Verify that none of the wires obstruct the mounting holes 12 Attach the motor frame to the front case with a 2 56 x 3 16 inch fillister head screw...

Page 103: ...ring Practices and Abbott Guidelines The serial number is crucial for tracking the manufacture sale and maintenance of each device and must not be altered for any reason at any time To assure serial n...

Page 104: ...assembly Procedure then complete the PVT and burn in test as described in Section 5 Maintenance and Service Tests 751 AIM Beeper 1 Ifreplacing the back case but not the beeper piezo element remove the...

Page 105: ...gh the large hole in the motor frame and seating the optics carrier on the frame refer to Figure 7 12 Optics Carrier to Motor Frame 3 Secure the optics assembly to the motor frame with two 2 56 x 3 16...

Page 106: ...ion onto the shaft Assure that the extension is completely seated then tighten the set screw 3 Align the motor mounting holes to the holes in the motor frame and assure that the motor wires are tumed...

Page 107: ...2 Remove the ejector pivot pins and lift the latch assembly from the motor frame refer to 3 Position the replacement latch assembly into the motor frame and insert the pivot pins 4 Complete the reasse...

Page 108: ...required if the pump is not disassembled To replace the spring only 1 Use Allen wrench to remove set screw refer to 2 Remove the spring to be replaced Place the new spring in the lever arm cavity 3 A...

Page 109: ...O tres Des Motor connector J11 Mt D les 5 mf EEE om ELE SUE samu MSE EE Sc we ms ate a no ola Optics connector J9 sto 4 button keypad o ms EUA i ey X connector J14 ma Z 1 Number keypad 7 connector J3...

Page 110: ...omplete reassembly as directed in Section 7 4 Pump Reassembly Procedure then complete the PVT and burn in test as described in Section 5 Maintenance and Service Tests 754 AIM Plus Beeper Materials Req...

Page 111: ...attery Connector Cable Assembly with clips Battery Jumper Assembly with clips Battery Door with interconnect PCB installed After following the instructions below to replace the indicated component or...

Page 112: ...the label 7 10 3 Front Case Labels 1 Tfreplacing a label detach the label to be replaced from the front case and remove any residue To replace battery polarity label use flux remover to eliminate sil...

Page 113: ...O Loctite 425 1 Remove the knurled nut with the driver Pull the jack to be replaced and lockwasher clear of the case 2 With the lockwasher between the new jack and the inside of the front case install...

Page 114: ...n the case Tighten by turning knurled nut with driver while holding the jack in position 7 10 6 Battery Connector Cable and Jumper 1 Disconnect the component s to be replaced 2 Installa new battery co...

Page 115: ...If required install new spacers by removing the protective backing and affixing each spacer in the recessed area inside the front case 2 Place the display module over the window and under the molded...

Page 116: ...lock the display connector 7 11 2 Spacer Cushion If the pump being serviced does not have a spacer cushion installed on the display module it is recommended to install one as described below 1 Remove...

Page 117: ...emains on for three seconds after the keystroke Pressing the remote bolus switch does not activate the backlight 12 or 24 hour clock accuracy 1 minutes month or better Keypads 22 raised profile switch...

Page 118: ...of air when infusing emulsions pump may require air bubble larger than 100 UL to cause alarm Pump alarms at approximately 300 uL of air AIM Pump alarms at approximately 2 mL of air AJM Plus If user h...

Page 119: ...IM Microprocessor CPU Schematic Figure 9 3 AIM Power and Miscellaneous Circuitry Schematic Figure 9 4 AIM PC Board Front Side Figure 9 5 AIM PC Board Back Side Figure 9 6 AIM Plus Analog Schematic Fig...

Page 120: ...ABBOTT LABORATORIES HOSPITAL PRODUCTS DIVISION FIGURE 51 AN Analog Schematic DRAMINO NO REV B 101753 SHEET 1 OF 3 AM AM PLUS TSM 430 800035 002 1...

Page 121: ...i TRIED TES R RET EN NTR SOLIOL ON 04800 DADOS NES AOS MN 30 Z 13345 2 6 n NOISWO SIDNOOBA TvUdSOH S MOLYUORYT Lossy Nois COM COM voit GOH SOM Lory eos ER...

Page 122: ...an 10 GA T POWER ok maz Ki KOLD 52032 1010 kg 5 amena aneta ve ves DRE 5 ABBOTT LABORATORIES HOSPITAL PRODUCTS DMSION FIGURE 9 3 AM Power and Miscoloneovs Cieuitry Schematie 101753 ARZAM PLUS TSM 430...

Page 123: ...A in ACT E OC 00009020000 00000000000 00000000000 2000000 US V 000800000000000009000 ABBOTT LABORATORIES HOSPITAL PRODUCTS DIVISION FIGURE 9 4 AM PC Boord Front Side DRAWING NO REY D 101749 SHEET y OF...

Page 124: ...el E e el vonage E 000 0001 aa E linda diane aga fi OCR aa i DO fr mm M a ada E GEM Ti Jato Std yoy Zee OY 1 2018 1618 bi AREA 0918 Ton HEEara Do ON 200 500009 06 MSI SMS AN NIY IS yang 12008 00 117...

Page 125: ...A 0007400001 eml 000000000000 0009000 B R143 E us 1170000 U7 1100008 0100008 DI 0000008 COPYRIGHT 1993 ABBOTT AIM 00900400000 000000906 00 00000 ABBOTT LABORATORIES HOSPITAL PRODUCTS DMSION TGURE 9 9...

Page 126: ...ABBOTT LABORATORIES HOSPITAL PROOUCTS DMSION FIGURE 9 6 AM Plus Anaiog Schematic DRAWING NO 102020 SHEET 1 OF 3 ANAN PLUS TSM 430 600035 002 2...

Page 127: ...EU ree TES TE I ode VON TON Coin sora SOM 0018 sota seu i LO ITEM EE 2 a ess i SES j EG 8 i ELT 38 emo 00 ec0009 0EY NSJ Snd AN E ap g SHS UAE NAD Meee AY 6 38094 NOISINO 61200080 70005 S3R4OTVHOGYT 0...

Page 128: ...CORE e 16900 oe m Li as a ce 2 T Eletro a soak ke m 3 Ls ge LET TOK ABBOTT LABORATORIES HOSPITAL PRODUCTS FIGURE 9 8 Ai Pius Power end Wisceloneous Circuitry Schematic DRAWING NO REV A 102020 SHEET 3...

Page 129: ...805 NOISIO SIOnOHd VHdsOH ES mT TT nf ii BZ O Ri a mm 000 a ata rane UA o EC Tor no af HRS E oz Ek Po som p E pg Ti me 8 310 que iis DDD JA soli lis pau DTA QE F mi iy a AR a mmom a etiam 0008 10005 E...

Page 130: ...ll is a registered trademark of Duracell Inc Seiko is a registered trademark of Seiko Instruments Inc Diconix is a registered trademark of Eastman Kodak Corporation Super Edisonite is a registered tra...

Reviews: