![ABB ZSD 2020 Overhaul Instructions Download Page 47](http://html.mh-extra.com/html/abb/zsd-2020/zsd-2020_overhaul-instructions_3045399047.webp)
Date: 2021-01-13
Version: 1.2
Overhaul instructions
Central lubrication unit
Installation
Page 47 of 50
•
Connect all hoses and connectors (
37
) to the solenoid valve (
34
).
Figure 32: Connecting hoses and plugs
Item number
Designation
(
34
)
Solenoid Valve
(
37
)
Plug
•
Start the system and check the correct function of each component.
© 2021 ABB Automation GmbH |
en