![ABB ZSD 2020 Overhaul Instructions Download Page 44](http://html.mh-extra.com/html/abb/zsd-2020/zsd-2020_overhaul-instructions_3045399044.webp)
Date: 2021-01-13
Version: 1.2
Overhaul instructions
Central lubrication unit
Installation
Page 44 of 50
•
Connect all plastic tubes (
33
).
Figure 29: Fitting tubes
Item number
Designation
(
33
)
Plastic tubing PLN-8x1.25-NT
•
Start the system and check the correct function of each component.
© 2021 ABB Automation GmbH |
en