![ABB ZSD 2020 Overhaul Instructions Download Page 38](http://html.mh-extra.com/html/abb/zsd-2020/zsd-2020_overhaul-instructions_3045399038.webp)
Date: 2021-01-13
Version: 1.2
Overhaul instructions
Central lubrication unit
Installation
Page 38 of 50
5.2
Fitting the filling strainer
•
Screw the filling strainer (
1
) onto the lid (
5
).
Figure 23: Screwing on the filling strainer
Item number
Designation
(
1
)
Filling strainer
(
5
)
Lid
© 2021 ABB Automation GmbH |
en