
Operation Manual / A200-L
9 Disassembly and assembly / 9.12 Dismantling the nozzle ring (A280-L)
© Copyright 2021 ABB. All rights reserved.
HZTL4036_EN
Rev.T
December 2021
9.12
Dismantling the nozzle ring (A280-L)
Fig. 48: Fitting the nozzle ring holder
1. Remove screws (B
2
).
2. Fit the nozzle ring holder (90477) with screws (B
1
) at the top of the flange of the gas inlet
casing (51001).
Page
91
/
145