![ABB TZIDC Operating Instructions Manual Download Page 27](http://html.mh-extra.com/html/abb/tzidc/tzidc_operating-instructions-manual_3204027.webp)
Electrical
connections
42/18-84-EN
TZIDC, TZIDC-110, TZIDC-120
27
5.3
Cable entry
IMPORTANT (NOTE)
The cable terminals are delivered closed and must be unscrewed before inserting the cable.
For the cable entry into the housing, on the left-hand side of the housing there are two tap holes
in four thread combinations to accommodate the cable entry and pneumatic connection.
- Cable: thread 1/2-14NPT, air pipe: thread 1/4-18 NPT
- Cable: thread M20 x 1,5, air pipe: thread 1/4-18 NPT
- Cable: thread M20 x 1,5, air pipe: thread G 1/4
- Cable: thread G 1/2, air pipe: thread Rc 1/4
As an option, one thread can be fitted with a cable gland and the other with a pipe plug if
necessary.
Fig. 19: Cable entry
1
Pipe plug
2
Cable gland
5.4
Setting the mechanical feedback
5.4.1 Mechanical position indicator
1.
Loosen the screws for the housing cover and remove it.
2.
Rotate the position indicator on the shaft to the desired position.
3.
Attach the housing cover.
4.
Affix the symbol label to mark the minimum and maximum valve positions on the housing
cover.
IMPORTANT (NOTE)
The adhesive labels are located on the inside of the cover.
Summary of Contents for TZIDC
Page 57: ...Ex relevant specifications 42 18 84 EN TZIDC TZIDC 110 TZIDC 120 57 ...
Page 58: ...Ex relevant specifications 58 TZIDC TZIDC 110 TZIDC 120 42 18 84 EN ...
Page 59: ...Ex relevant specifications 42 18 84 EN TZIDC TZIDC 110 TZIDC 120 59 ...
Page 67: ...Ex relevant specifications 42 18 84 EN TZIDC TZIDC 110 TZIDC 120 67 ...
Page 68: ...Ex relevant specifications 68 TZIDC TZIDC 110 TZIDC 120 42 18 84 EN ...
Page 76: ...Ex relevant specifications 76 TZIDC TZIDC 110 TZIDC 120 42 18 84 EN ...
Page 77: ...Ex relevant specifications 42 18 84 EN TZIDC TZIDC 110 TZIDC 120 77 ...
Page 84: ...Appendix 84 TZIDC TZIDC 110 TZIDC 120 42 18 84 EN ...