Operation Manual / TPL65-A32 / -A33 / -A36 + TPL69-A32 / -A33
Commissioning
3
Inspection work
3.2
Page 34
Sept
em
be
r 2
014
H
ZT
L24
98_
EN
R
ev
is
ion A
Inspection work
3.2
Inspection work includes preventive visual controls plus monitoring and
measuring work before and during commissioning. Inspections help detect
changes to the turbocharger. Machine damage can be avoided.
Inspection before commissioning
Check for correct functioning.
Inspect for damage.
Check oil filter for cleanliness before starting up.
CAUTION
Dirty oil
Particles of dirt and solid matter in the oil can cause serious damage to
the machine or property.
During initial commissioning and after all service work, the complete
lubricating system must be flushed thoroughly with warm oil.
When running in the engine and all service work on the lubricating
system, special running-in filters must be used.
Check oil pressure in oil supply lines.
TPL65: Version with compressor wheel cooling system
Check whether compressor wheel cooling system is fitted to bearing
casing.
CAUTION
Failure of compressor wheel cooling system
The service life of the compressor wheel will be impaired if the
breakdown of the compressor wheel cooling system lasts long.
Ensure supply of cooling air.
3.2
3.2.1
Monitoring measures /
equipment
Air filter mat
Lubricating system