TERR A 54 / 54HV CHAR G ER
2018- 10- 03
22/40
5
Receiving, Placing and connecting
5.1
Receiving the cabinet
The product is delivered by a transport company to a warehouse where it will be handed over.
Transporting the T54 to its final location (last mile service) is not standard included in the or-
der.
NOTICE
The delivery truck unloads the pallet carrying the Terra 54.
The movement of the Terra 54 to its final location is the re-
sponsibility of the customer / contractor.
Check whether the Terra 54 has not been shaken or tilted.
•
The cabinet is equipped with Shockwatch and Tiltwatch indicators.
Checking the Shockwatch and TiltWatch PLUS sensors:
If the ShockWatch indicator is red, or the TiltWatch PLUS indicator is tilted over 30°:
1.
Do not refuse the delivery / receipt.
2.
Make a notation on the delivery receipt and inspect cabinet for damage.
3.
If damage is discovered, leave cabinet in original package and request immediate
inspection from carrier within 3 days of delivery.
4.
Contact ABB The Netherlands by mail ([email protected]) or phone (+3170
3076 201) to notify us about your findings.
5.2
Unpacking cabinet, mounting preparations
5.2.1
Unpacking
The packaging of the Terra 54 can be removed without the use of tools.