ABB | SACE Emax 2
32 | © 2017 ABB | 1SDH001330R0002 - ECN000058721 Rev. A
Ekip Dip protection trip unit | 6 - Ekip Dip: additional functions
6 - Ekip Dip: additional functions
Presentation
Ekip T&P, Ekip Programming and Ekip Bluetooth allow the protection trip unit to be connected to Ekip
Connect software and to access parameters and commands that cannot be accessed directly from the front
interface: a description of the various functions is given below.
The additional protections available via Ekip Connect are described on page 25.
Maintenance
The Maintenance function allows signalling to the user, via LED, that:
• One year has passed since the last maintenance.
• Contact wear has increased by more than 10% compared with the value at the last maintenance.
Via Ekip Connect there are two selections available:
• Activation: it allows to the maintenance function to be activated.
• Reset: it allows confirmation of maintenance on the trip unit; the present date and contact wear values
are recorded, and the signal is reset.
The reference date is that of the internal clock, and the elapsed time is calculated both with the trip unit on
and off (provided that the internal battery is working).
NOTE:
manual modification of the date can cause variations in the calculation of the time
elapsed, and therefore in the date of the next maintenance.
NOTE:
the maintenance signal due to increased contact wear is active for values higher than
20 %.
Local Bus
In order to activate communication on the Local Bus with the Ekip Link, Ekip Multimeter or Ekip Signalling
10K modules, the Local Bus parameter must be enabled.
NOTE:
communication with the modules is active if the auxiliary power supply is present.
Date and time
The Ekip Dip trip unit has a user-adjustable internal clock.
Setting the date can be useful for some functions such as the recording of trips and minimum and maximum
currents, and maintenance.
The clock is active if the internal battery of the trip unit is working.
Summary of Contents for SACE Emax E1.2
Page 2: ...ABB SACE Emax 2 2 2017 ABB 1SDH001330R0002 ECN000058721 Rev A ...
Page 8: ...VI 2017 ABB SACE Emax 2 1SDH001330R0002 ECN000058721 Rev A ...
Page 9: ...ABB SACE Emax 2 3 2017 ABB 1SDH001330R0002 ECN000058721 Rev A ...
Page 310: ...ABB SACE Emax 2 304 2017 ABB 1SDH001330R0002 ECN000058721 Rev A Service 1 Power Care ...