51
Disassembly instruction emaX 2 e6.2
6.10 PHASE 10 – OPERATING SHAFT ASSEMBLY
Actions to be performed
Tools
Cross screwdriver
Torx key
No. 30
Flat screwdriver
201
By means of the torx key unscrew the 2 screws fixing the 2 intermediate plates to the circuit
breaker main structure.
202
Manually lift the operating shaft assembly and by means of the flat screwdriver remove the 6
benzings.
203
Manually lift the operating shaft assembly and by means of the flat screwdriver remove the 6
pins.
Summary of Contents for SACE Emax 2 E6.2
Page 1: ... INSTRUCTION HANDBOOK 1SDH002306A1001 ECN000285442 EMAX 2 E6 2 Disassembly instructions ...
Page 2: ......
Page 70: ...70 INSTRUCTION HANDBOOK ...
Page 71: ......