Step-up
transformer
G
Field breaker
Excitation
transformer
I
L1
I
L2
I
L3
U
A
U
a
Pri-side (HV)
Sec-side (LV)
IEC12000019-1-en.vsd
Two alternative
measurement points
for the rotor overload
function
L1
i
L2
i
L3
i
IEC12000019 V1 EN
Figure 220:
Measurement of rotor currents
The selection of current measurement is done by using the parameter
MeasurCurrent
:
•
When
MeasurCurrent
= RMS; The maximum true RMS current value from the
three-phase input currents is used as the measured quantity for the rotor overload
protection.
•
MeasurCurrent
= DC (default); The calculated rotor winding DC current in
primary amperes is used as the measured quantity for the rotor overload
protection. The DC current is calculated from the connected three-phase input
currents, see Figure
. This DC current calculation is valid for any type of three
phase rectifier bridge (i.e. either diode or thyristor based).
In order to properly calculate the rotor winding DC current the physical location of the
used CT is defined by the parameter
CT_Location
•
When
CT_Location
=
LV_winding
(default) is selected, it means that the used CT
is located on the secondary, low-voltage side (LV) of the excitation transformer
which directly feeds into the rectifier bridge, see Figure
. In that case the rotor
winding instantaneous DC current i
DC
is calculated as per the following equation
i
i
i
i
DC
L
L
L
=
+
+
1
2
3
2
GUID-17CD8C1A-C1C2-4A9C-9339-2C99C3A3F120 V2 EN
(Equation 101)
Section 8
1MRK502052-UEN B
Current protection
468
Technical manual
Summary of Contents for Relion REG670
Page 1: ...Relion 670 series Generator protection REG670 2 0 IEC Technical manual ...
Page 2: ......
Page 44: ...38 ...
Page 58: ...52 ...
Page 80: ...74 ...
Page 106: ...100 ...
Page 482: ...476 ...
Page 548: ...542 ...
Page 570: ...564 ...
Page 600: ...594 ...
Page 608: ...602 ...
Page 630: ...624 ...
Page 862: ...856 ...
Page 1094: ...1088 ...
Page 1226: ...1220 ...
Page 1250: ...1244 ...
Page 1297: ...1291 ...