In the short cut menu, right click and select
Generate log
.
•
Click the
Generate log
button.
Besides generating a report you can also generate a log file with the same
information as for the report. Open and see the details of the file in Notepad
or MS Excel.
After a successful generation of the log, the system confirms with a message
along with the path of the log file.
10.8
Editing features in graph
You can do the following operations on the graph during calibration,
commissioning and monitoring:
•
Zoom in
•
Zoom out
•
Cancel zoom
•
Enable X-zooming
•
Enable Y-zooming
1.
Zoom in one of the following ways:
•
Right click a graph and select
Zoom in
or
Zoom out
in the shortcut menu.
IEC11000051-1-en.vsd
GUID-3F080E48-8B77-48A0-8283-89511E1AE50B V1 EN
Figure 73:
Zooming via the shortcut menu
•
Use the mouse to zoom in and select a part of the graph area.
1MRK 502 029-UEN A
Section 10
Calibrating injection based sensitive rotor earth fault protection
117
Installation and commissioning manual
Summary of Contents for Relion 670 series
Page 1: ...Relion 670 series Generator protection REG670 Installation and commissioning manual...
Page 2: ......
Page 16: ...10...
Page 24: ...18...
Page 26: ...20...
Page 28: ...22...
Page 92: ...86...
Page 96: ...90...
Page 102: ...96...
Page 108: ...102...
Page 112: ...106...
Page 126: ...120...
Page 140: ...134...
Page 150: ...144...
Page 234: ...228...
Page 238: ...232...
Page 250: ...244...
Page 259: ...253...