Disturbance recorder
M12179-446 v5
OperationM
: Analog channel M is to be recorded by the disturbance recorder (
On
)
or not (
Off
).
If
OperationM
=
Off
, no waveform (samples) will be recorded and reported in
graph. However, Trip value, pre-fault and fault value will be recorded and reported.
The input channel can still be used to trig the disturbance recorder.
If
OperationM
=
On
, waveform (samples) will also be recorded and reported in
graph.
Setting information
GUID-B0D40F6D-3CE4-4FF3-81B4-B453FDD389CB v1
SetInfoInDrep
: Parameter used to enable or disable the settings information in
disturbance header.
Event recorder
M12179-444 v4
Event recorder (ER) function has no dedicated parameters.
Trip value recorder
M12179-442 v3
ZeroAngleRef
: The parameter defines which analog signal that will be used as
phase angle reference for all other analog input signals. This signal will also be
used for frequency measurement and the measured frequency is used when
calculating trip values. It is suggested to point out a sampled voltage input signal,
for example, a line or busbar phase voltage (channel 1-30).
Event list
M12179-440 v3
Event list (EL) (SOE) function has no dedicated parameters.
18.6.3.5
Consideration
M12179-420 v6
The density of recording equipment in power systems is increasing, since the
number of modern IEDs, where recorders are included, is increasing. This leads to
a vast number of recordings at every single disturbance and a lot of information has
to be handled if the recording functions do not have proper settings. The goal is to
optimize the settings in each IED to be able to capture just valuable disturbances
and to maximize the number that is possible to save in the IED.
The recording time should not be longer than necessary (
PostFaultrecT
and
TimeLimit
).
•
Should the function record faults only for the protected object or cover more?
•
How long is the longest expected fault clearing time?
•
Is it necessary to include reclosure in the recording or should a persistent fault
generate a second recording (
PostRetrig
)?
Minimize the number of recordings:
Section 18
1MRK 506 369-UEN B
Monitoring
790
Line distance protection REL670 2.2 IEC
Application manual
Summary of Contents for REL670 2.2 IEC
Page 1: ...RELION 670 SERIES Line distance protection REL670 Version 2 2 IEC Application manual ...
Page 2: ......
Page 32: ...26 ...
Page 70: ...64 ...
Page 110: ...104 ...
Page 152: ...146 ...
Page 564: ...558 ...
Page 570: ...564 ...
Page 592: ...586 ...
Page 706: ...700 ...
Page 804: ...798 ...
Page 848: ...842 ...
Page 860: ...854 ...
Page 882: ...876 ...
Page 896: ...890 ...
Page 906: ...900 ...
Page 907: ...901 ...