ABB Substation Automation
Products and Systems
User’s Guide
REJ 513
1MRS750613-MUM
41
Settings
Table 2.1.7.3-1 Settings
Variable
Actual
settings
(R)
Group 1
(R, W, P)
Group 2
(R, W, P)
Setting
range
Start current of stage I>
S1
S41
S81
0.30...5.00 x I
n
Operate time or time
multiplier k of stage I>
S2
S42
S82
0.05...300 s /
0.05...1.00
1)
Start current of stage I>>
S3
2)
S43
S83
0.30...35.0 x I
n
Operate time of stage
I>>
S4
S44
S84
0.04...300 s
Checksum, SGF 1
S5
S45
S85
0...255
Checksum, SGF 2
S6
S46
S86
0...255
Checksum, SGF 3
S7
S47
S87
0...255
Checksum, SGB 1
S8
S48
S88
0...255
Checksum, SGR 1
S9
S49
S89
0...255
Checksum, SGR 2
S10
S50
S90
0...255
Checksum, SGR 3
S11
S51
S91
0...255
Checksum, SGR 4
S12
S52
S92
0...255
Operate time of circuit-
breaker failure protection
-
S121
S121
0.10...1.00 s
1)
Values above 1 equal 1.
2)
If the protection stage has been set out of function, “999” displaces the number
indicating the currently used value in serial communication.