IL1
|DI|
a
b
a>b
DI<
One cycle
delay
UL1
a
b
a>b
One cycle
delay
DU>
|DU|
a
b
a>b
t
20 ms
t
1.5 cycle
AND
DUDI detection Phase 1
UPh>
DUDI detection Phase 2
Same logic as for phase 1
IL2
UL2
DUDI detection Phase 3
Same logic as for phase 1
IL3
UL3
a
b
a<b
UL1
IL1
a
b
a>b
IPh>
AND
AND
CBCLOSED
OR
OR
AND
a
b
a<b
UL2
IL2
a
b
a>b
AND
AND
OR
OR
AND
a
b
a<b
UL3
IL3
a
b
a>b
AND
AND
OR
OR
AND
OR
FuseFailDet
DUDI
DUDI Detection
IEC10000034-1-en.vsd
IEC10000034 V1 EN
Figure 158:
Simplified logic diagram for DU/DI detection part
1MRK 502 048-UEN A
Section 11
Secondary system supervision
313
Technical manual
Summary of Contents for REG650 ANSI
Page 1: ...Relion 650 series Generator protection REG650 Technical manual ...
Page 2: ......
Page 36: ...30 ...
Page 42: ...36 ...
Page 50: ...44 ...
Page 64: ...58 ...
Page 86: ...80 ...
Page 262: ...256 ...
Page 300: ...294 ...
Page 438: ...432 ...
Page 476: ...470 ...
Page 592: ...586 ...
Page 664: ...658 ...
Page 678: ...672 ...
Page 726: ...720 ...
Page 727: ...721 ...