When the forcing is removed by exiting from IED test mode, both
input and output signals may change values. This means that logic
input signals may activate functions in the IED and that output
relays may change state, which can be potentially dangerous.
10.8.4.1
Undo forcing by using TESTMODE component
GUID-CA5CCA57-DFFF-4362-AC1D-08738D2BA45F v2
•
If the IED test mode was entered through the test mode function block:
1.
Deactivate the control input on that block.
This immediately undoes all forcing, regardless of how it was accomplished
and disabled all the way to force signals.
10.8.4.2
Undo forcing by using LHMI
GUID-55199606-E70D-49B1-885D-251700FB562B v1
•
If the IED test mode was enabled to using the LHMI:
1.
Set
IEDTestMode
to
Off
in the
LHMI
menu.
2.
Exit from the menu and click
Yes
in the Save dialogue box.
This immediately undoes all forcing, regardless of how it was accomplished
and disabled.
10.8.4.3
Undo forcing by using PCM600
GUID-CE7FD186-99FC-41C8-910F-894A57037777 v1
1.
Uncheck
Forcing Session
under the menu
IED
.
IEC15000031 V1 EN-US
2.
Click
Yes
in the confirmation dialogue box.
PCM600 will revert all forced signals back to unforced and the real signal
values will immediately take effect again.
This may change both binary input values and output relay states
and will undo any forcing done by using the LHMI.
Section 10
1MRK 505 378-UEN A
Testing IED operation
100
Line differential protection RED670 2.2 IEC
Commissioning manual
Summary of Contents for RED670 Relion 670 series
Page 1: ...RELION 670 SERIES Line differential protection RED670 Version 2 2 IEC Commissioning manual ...
Page 2: ......
Page 18: ...12 ...
Page 36: ...30 ...
Page 68: ...62 ...
Page 72: ...66 ...
Page 108: ...102 ...
Page 278: ...272 ...
Page 282: ...276 ...
Page 288: ...282 ...
Page 306: ...300 ...
Page 307: ...301 ...