
Unloading
WARNING!
To prevent damage to the compact skid, keep the delivery packaging and protection
canvas on until you install it.
WARNING!
Inspect the compact skid carefully before performing any activity. Check that there
is no protuberance or any general poor condition.
■
Tools used for unloading
•
Eight tons forklift
•
Two guide platforms with length twelve meters and width 500 mm (not provided)
•
Two belly chains of 9.5 tons
•
Two slings of eight tons. Minimum five meters.
■
Pre-requisite
Follow the below instructions before you start unloading the PVS980-CS received in a 40 ft
HC container:
1.
Protect the corners of the compact skid against shock.
2.
Make sure that the terrain is level and sturdy. Consider that the compact skid has an
approximate weight of 15 tons.
3.
Unload the standard container carrying the compact skid inside. Follow local regulations
and applicable standards such as ISO 3874.
4.
Remove all stops, and transportation sling or chains at both ends and laterals.
34 Storing, lifting and transporting