70 Mechanical installation
Calculating the required static pressure difference
The required static pressure difference between the exit air duct and the inverter
installation room can be calculated as follows:
where
p
d
dynamic pressure
air density (kg/m
3
)
v
m
average air velocity in the exit duct(s) (m/s)
q
rated air flow of the inverter (m
3
/s)
A
c
cross-sectional area of the exit duct(s) (m
2
)
Example:
The cabinet has 3 exit openings of 315 mm diameter. The rated air flow of the cabinet is
3760 m
3
/h = 1.0 m
3
/s.
A
c
= 3 • 0.315
2
• / 4 = 0.234 m
2
v
m
=
q
/
A
c
= 1.0 / 0.234 = 4.3 m/s
p
d
= 0.5 • •
v
m
2
= 0.5 • 1.1 • 4.3
2
= 10 Pa
The required pressure in the exit air duct is then, 1.5…2 • 10 Pa = 15…20 Pa, below the
pressure in the room.
More information: Contact ABB.
p
s
= (1.5…2) •
p
d
ǻ
p
d
= 0.5 •
•
v
m
2
v
m
=
q
/
A
c
Summary of Contents for PVS800-57-0100kW-A
Page 1: ...ABB solar inverters Hardware manual PVS800 57 central inverters 100 to 1000 kW ...
Page 4: ......
Page 22: ...20 Safety instructions ...
Page 64: ...62 Operation principle and hardware description ...
Page 74: ...72 Mechanical installation ...
Page 90: ...88 Electrical installation PE PE PE ...
Page 124: ...122 Maintenance ...
Page 152: ...150 Dimension drawings Frame R7i 3AUA0000083128 ...
Page 153: ...Dimension drawings 151 AC output 3AUA0000083128 ...
Page 154: ...152 Dimension drawings 3AUA0000083128 One DC input Four DC inputs ...
Page 156: ...154 Dimension drawings R8i 8 DC inputs option 8H382 3AXD50000016935 ...
Page 157: ...Dimension drawings 155 R8i AC output terminals 3AXD50000016935 ...
Page 165: ...Dimension drawings 163 2 R8i AC output terminals 3AXD50000015007 ...
Page 173: ...Dimension drawings 171 3 R8i AC input terminals 3AXD50000015006 ...
Page 178: ...176 Dimension drawings ...
Page 180: ...Contact us www abb com solar 3AUA0000053689 Rev H EN EFFECTIVE 2014 07 09 ...