Start-up 101
ADJUSTING GROUNDING RESISTANCE FOR POSITIVE OR NEGATIVE POLE
GROUNDING (oF282 and +F283)
By default, the grounding resistance is set to 3 kohm. If needed,
modify the resistor configuration on the PGND-02 (A20) board as
follows:
•
WARNING!
Make sure that the voltage is disconnected and
the DC main switch (Q2) is open.
• Remove the shroud protecting the board.
• Rewire the jumper wires on terminals X4 and X5.
PARAMETER SETTINGS BEFORE FIRST START
Make the parameter settings needed before the first start
according to the firmware manual.
See the start-up section in the
firmware manual.
FIRST START (local control mode)
Measure and record the DC voltage from the solar generator.
-100kW units with optional miniature circuit breakers (+H377):
Open the miniature circuit breakers. Measure and record all DC
inputs.
Note
: The expected and measured
DC voltages should be roughly
equal.
-100kW units with optional miniature circuit breakers (+H377):
Close the miniature circuit breakers.
Close the AC and DC main switches.
Switch on the auxiliary power.
The control boards and the
CDP312R control panel should
“wake up”. The inverter is in the
stand-by mode if no faults are active.
This is indicated by the STAND BY
text on the control panel. For
descriptions of the inverter modes,
refer to the firmware manual.
Note:
There may be fault and
warning indications flashing on the
display. They will be reset during the
next steps.
Ensure that the control panel is controlling the master control unit
(A43) by checking the node number from the display.
See the firmware manual.
Units with optional emergency stop function (+Q951): Release
the emergency stop button and reset the emergency stop circuit.
Units with optional positive/negative grounding (+F282/+F283):
Configure the grounding option.
See the firmware manual.
Reset all faults on both control boards.
See the firmware manual.
Check that the DC voltage of the solar generator matches the
value of 01.34 PV MODULE DC MEAS in the Master control
program.
Note
: If the DC voltage differs from
the parameter value, do not try to
start the inverter. Contact ABB.
1 -> 654.0 V
STATE STAND BY
AC POWER 0.0 kW
AC CURR1 0 A
Summary of Contents for PVS800-57-0100kW-A
Page 1: ...ABB solar inverters Hardware manual PVS800 57 central inverters 100 to 1000 kW ...
Page 4: ......
Page 22: ...20 Safety instructions ...
Page 64: ...62 Operation principle and hardware description ...
Page 74: ...72 Mechanical installation ...
Page 90: ...88 Electrical installation PE PE PE ...
Page 124: ...122 Maintenance ...
Page 152: ...150 Dimension drawings Frame R7i 3AUA0000083128 ...
Page 153: ...Dimension drawings 151 AC output 3AUA0000083128 ...
Page 154: ...152 Dimension drawings 3AUA0000083128 One DC input Four DC inputs ...
Page 156: ...154 Dimension drawings R8i 8 DC inputs option 8H382 3AXD50000016935 ...
Page 157: ...Dimension drawings 155 R8i AC output terminals 3AXD50000016935 ...
Page 165: ...Dimension drawings 163 2 R8i AC output terminals 3AXD50000015007 ...
Page 173: ...Dimension drawings 171 3 R8i AC input terminals 3AXD50000015006 ...
Page 178: ...176 Dimension drawings ...
Page 180: ...Contact us www abb com solar 3AUA0000053689 Rev H EN EFFECTIVE 2014 07 09 ...