![ABB PT004149 Operation Manual Download Page 85](http://html2.mh-extra.com/html/abb/pt004149/pt004149_operation-manual_5245577085.webp)
Operation Manual / Power2 850-M / High-pressure stage
9 Disassembly and assembly / 9.13 Installing the wall insert
© Copyright 2022 ABB. All rights reserved.
HZTL4063_EN
Rev.F
March 2022
Fig. 40: Installing the wall insert 2
Part number
Thread and tightening torque
72002
M12x95
50 Nm
Table 46: Tightening torque (72002)
6. Fit a nut (72004) as a safeguard.
7. Remove bracket (90030).
8. Slide in wall insert (77000) as far as it will go.
9. Detach speed measurement cable from provisional holder and insert cable connector
(86515).
10. Fit three studs (72002) again in upper area and tighten.
Page
83
/
104
Summary of Contents for PT004149
Page 2: ......