92 Operation
Graphical display
The graphical display shows:
• Operational status
• Menus
• Performance monitoring
• Event messages (for example, faults, warnings and maintenance reminders)
• Help texts
on page
for information on settings necessary when the inverter
is started for the first time.
on page
for a map of the inverter menu hierarchy.
Display layout
The graphical display has the general layout shown in the example view. Some
special screens have a different layout.
Energy view
The
Energy
view shows the status and history of the power produced by the system.
This view is shown when the inverter starts and detects user interaction.
The user can toggle back and forth between numeric and graphical histogram views.
The histograms show one column per hour, day, month or year. The current column is
always shown in a different shade to the others. Use the left and right arrow keys to
choose between different time periods. Note that if you change the date and time
settings, this has an effect on the energy views.
In the
Energy: Today
view, the number in the upper right corner shows the cumulative
value of energy produced during the day so far. The number in the upper left shows
the current output power in kW. If the inverter is disconnected from the grid or is not
feeding power, then “-- kW” is shown.
The format (12-hour or 24-hour) of the time points below the graph depends on the
country settings. You can set the format in the
Date and time
submenu.
Example view
No. Area
Description
1
Status bar
Current view, date and status icon.
Not shown in special screens.
2
Content area Current view contents, e.g. menu,
parameter, help text, etc.
3
Softkey bar
Softkey commands and the real-
time clock, if enabled. The
commands depend on the view.
1
2
3
Summary of Contents for PRO-33.0-TL Series
Page 1: ...ABB solar inverters Product manual PRO 33 0 TL string inverters ...
Page 4: ......
Page 10: ...10 Table of contents ...
Page 32: ...32 Hardware description ...
Page 40: ...40 Installation requirements ...
Page 70: ...70 Electrical installation ...
Page 74: ...74 Installation checklist ...
Page 110: ...110 Maintenance ...
Page 134: ...134 Navigation map The navigation map ...
Page 136: ...Contact us www abb com solarinverters 3AUA0000123261 Rev B EN 2015 06 18 ...