![ABB Power2 850-M46 Operation Manual Download Page 151](http://html.mh-extra.com/html/abb/power2-850-m46/power2-850-m46_operation-manual_2838038151.webp)
Operation Manual / Power2 850-M / 4.2 High-pressure stage
4 Disassembly and assembly / 4.10 Installing the cartridge group
© Copyright 2018 ABB. All rights reserved.
HZTL4063_EN
Revision B
October 2018
4.10
Installing the cartridge group
Fig. 16: Installing O-rings
u
Fit new O-rings (42017 / 42018).
Fig. 17: Installing the cartridge group 1
1. Clean slots for lamellar rings (64001) and fit new lamellar rings. Arrange joints so that
they are offset by 180°.
2. Fit bracket (90030) and plates (90031) (Bracket assembly
3. Fit lifting gear to swivel lifting eye (90657).
4. Lift cartridge group and carefully move in.
Page
21
/
37