Operation Manual / Power2 850-M / 4.1 Low-pressure stage
4
Disassembly and assembly
Page 11 / 49
© Copyright 2015 ABB. All rights reserved.
HZTL4062_EN
Revision -
December 2015
4
Disassembly and assembly
4.1
Introduction
CAUTION
Further operations
This Operation Manual may be used to carry out only those operations that
are described in it. If the cartridge group is disassembled or assembled
incorrectly, this can lead to serious engine damage.
ABB Turbo Systems recommends having further operations carried out
only by trained staff or an ABB Turbocharging Service Station.
NOTICE
Marking casing position for assembly
ABB Turbo Systems recommends marking the casing positions prior to
disassembly.
Identification of the assembly devices
Not all assembly devices are marked with a part number. Identification is guaranteed by the
tool list. This list is enclosed in the toolbox.
WARNING
Servicing the assembly devices
Assembly devices must be checked for damage before and after use.
Visually inspect for corrosion, cracks, deformation and wear.
Damaged assembly devices must no longer be used and must be
replaced.
Customer spare part set
Before starting operations, make sure the required customer spare part sets are available.
Tightening torques for components
The specified tightening torques of the screw fittings must be observed (see Table
Summary of Contents for Power2 850-M16
Page 28: ......
Page 32: ......
Page 42: ......
Page 44: ......
Page 70: ......
Page 78: ......
Page 80: ......
Page 82: ......
Page 86: ......
Page 88: ......
Page 90: ......
Page 92: ......
Page 94: ......
Page 96: ......
Page 100: ......
Page 130: ......
Page 134: ......
Page 138: ......
Page 140: ......
Page 142: ......
Page 178: ......