![ABB Power2 650-M46 Operation Manual Download Page 135](http://html.mh-extra.com/html/abb/power2-650-m46/power2-650-m46_operation-manual_2838027135.webp)
Operation Manual / Power2 650-M / 4.2 High-pressure stage
2 Removal and installation / 2.3 Installing the high-pressure stage
© Copyright 2019 ABB. All rights reserved.
HZTL4066_EN
Revision A
March 2019
2.3
Installing the high-pressure stage
2.3.1
Inserting gaskets
CAUTION
Inserting the gaskets
Gaskets that are forgotten, damaged or improperly inserted will lead to oil
leaks.
u
Always use new gaskets and insert them carefully into the slot.
Fig. 4: Gaskets in the slots of the bearing casing
42001
Bearing casing
42198
O-ring
42199
O-ring
01
Oil supply
02
Oil drains
The oil is supplied (01) and drained (02) through the bracket.
u
Insert the O-rings (42198 and 42199) into the slots of the bearing casing.
Page
7
/
39