![ABB Power2 650-M46 Operation Manual Download Page 101](http://html.mh-extra.com/html/abb/power2-650-m46/power2-650-m46_operation-manual_2838027101.webp)
Operation Manual / Power2 650-M / 4.1 Low-pressure stage
4 Disassembly and assembly / 4.7 Removing the compressor casing
© Copyright 2020 ABB. All rights reserved.
HZTL4065_EN
Rev.C
March 2020
7. Carefully move out wall insert.
Fig. 9: Removing wall insert 3
8. Fit support angle (90480) with screws (90955) and nut (90415).
9. Put down the wall insert (77000).
10. Remove plate (90032), screw (90656), nut (90432) and plates (90031).
Remove lifting gear and bracket (90030).
11. Remove O-rings (77040 / 79020 / 79021).
12. Loosen screws (77016) and remove diffuser (79000).
4.7
Removing the compressor casing
Fig. 10: Removing the compressor casing 1
1. Loosen two studs (72002) and screw (72021) in the upper area.
2. Fit bracket (90030) with four screws (90959).
3. Fit four plates (90031) and secure with plate (90032), screw (90656) and nut (90432).
Page
15
/
42