![ABB Power2 550-M Operation Manual Download Page 63](http://html.mh-extra.com/html/abb/power2-550-m/power2-550-m_operation-manual_2838020063.webp)
Operation Manual / Power2 550-M / High-pressure stage
7 Periodic maintenance / 7.4 Cleaning turbines and nozzle rings during
operation
© Copyright 2022 ABB. All rights reserved.
HZTL4058_EN
Rev.F
March 2022
7.4.3
Wet cleaning of turbine blades and nozzle ring
Prerequisites
The following operating state and the following prerequisites have been tested and ap-
proved by Turbo Systems for cleaning operations:
u
Set the engine load between 20 … 50% so that the turbine inlet temperature is between
380 … 430 °C.
Fig. 27: Load/time chart
u
Once the turbine inlet temperature of the high-pressure stage is stable and lying below
430 °C, wait at least another 10 minutes for the parts of the low and high-pressure stages
to cool down.
u
Start the cleaning cycle according to the following description Wet cleaning operation.
u
Only clean the low-pressure stage (Cleaning LP stage) if the low-pressure stage is con-
figured with this option. If this is not the case, drying is initiated directly after cleaning of
the high-pressure stage (Cleaning HP stage).
Page
63
/
119