
Adding the controller
Note/Illustration
Action
xx1800000845
Click the
Controller
under
Layout
to open
the
Add Existing System
dialog box.
1
xx1800000846
Click
Add
and then browse and select the
folder to be added to the
System Pool
.
To remove a folder from the list, click
Remove
.
2
xx1800000847
Click a system to select it for the new
solution in the
Systems Found
table lists.
3
xx1900000472
In the
Set Robot1 Pose
window, enter
numbers (0,0,1600) in the
Position X Y Z
(mm)
text box and (180,0,0) in the
Orient-
ation (deg)
text box.
4
Click
OK
to finish the adding of the con-
troller.
5
Continues on next page
308
Application manual - PickMaster® Twin - PowerPac
3HAC064218-001 Revision: B
© Copyright 2021 ABB. All rights reserved.
5 Production examples
5.1 Example: One pick work area and one place work area
Continued
Summary of Contents for PickMaster Twin - PowerPac
Page 1: ...ROBOTICS Application manual PickMaster Twin PowerPac ...
Page 8: ...This page is intentionally left blank ...
Page 12: ...This page is intentionally left blank ...
Page 16: ...This page is intentionally left blank ...
Page 420: ...This page is intentionally left blank ...
Page 444: ...This page is intentionally left blank ...
Page 446: ...This page is intentionally left blank ...
Page 448: ...This page is intentionally left blank ...
Page 452: ......
Page 453: ......