SPS POWER EXPRESS SHELF 

 

INPUT: 100

-

120VAC 15A, 200

-

240VAC 7.5A 

 

OUTPUT: 16 x 

-

42 TO 

-

57VDC 100VA PER CHANNEL 

 

Quick Start Guide  

-

  

 

8600427867P 

 

 

QUICK START GUIDE

 

This equipment is not suitable for use in locations where children are likely to be present. This equipment is 
intended only for use in a RESTRICTED ACCESS AREA.

 

Summary of Contents for J2007003L301CB

Page 1: ...00 120VAC 15A 200 240VAC 7 5A OUTPUT 16 x 42 TO 57VDC 100VA PER CHANNEL Quick Start Guide 8600427867P QUICK START GUIDE This equipment is not suitable for use in locations where children are likely to...

Page 2: ...re Battery Temp and Voltage monitor 14 Step 10 Install Rectifiers 14 Step 11 Verify Shelf ID Setting 14 Step 12 Initial Converter Modules 14 Step 13 Initial Start Up 14 Step 14 controller per galaxy p...

Page 3: ...y 11 Figure 9 DC Output connection 12 Figure 10 Controller Jumper 12 Figure 11 Controller Installation 13 Figure 12 Alarm Connection 13 Figure 13 Rectifier Installation 14 Figure 14 Shelf ID setting 1...

Page 4: ...indications with a controller The AC input and DC output connections are available at the rear side of the panel The Slimline power system shelf with IEC C19 AC input measures 44mm 1 73 x 440 7mm 17 3...

Page 5: ...Page 5 2021 ABB All rights reserved Version 1 0 Mounting Dimensions Figure 2 J2007003L301A and J2007003L301AB Dimensions Figure 3 J2007003L301C and J2007003L301CB Dimensions QUICK START GUIDE...

Page 6: ...Page 6 2021 ABB All rights reserved Version 1 0 Customer Care 1 877 546 3243 Reference Documents Documents Title J2007003 AD SPS POWER EXPRESS SHELF ASSEMBLY DRAWING QUICK START GUIDE...

Page 7: ...assure current does not exceed Continuous Load List 1 60 of protector rating Maximum Load List 2 typically end of discharge 80 of protector rating Field wired Conductors Follow all National Electric...

Page 8: ...ringer modules hazardous voltages will be present on the ringer output connectors Use the following precautions in addition to proper job training and safety procedures Use only properly insulated to...

Page 9: ...Page 9 2021 ABB All rights reserved Version 1 0 Equipment Identification Product Label QUICK START GUIDE...

Page 10: ...using three screws on each side four on each side 12 24 provided 3 Torque to 35 in lb 4Nm 5 16 socket 4 Provide 2 inch minimum clearance at back of shelf for converter airflow Step 2 Connect Chassis...

Page 11: ...screw driver Connect the 3 pin female connector to the AC input terminal of the shelf Mount the AC cover back over the input and tighten the thumb screw Danger Turn OFF and lock out tag out the AC so...

Page 12: ...ard angle Insert wire fully into wire entry Pull wire to verify insertion Figure 9 DC Output Connection Step 6 Set Controller Jumpers LAN port may be temporarily set to Local mode but must be set to N...

Page 13: ...vides Data connection for Battery temperature and voltage monitor Alarm J1 and J2 have detachable blocks which can be used to Wire to office alarms and signals Connect alarm cables to the 10 pin Alarm...

Page 14: ...fy Module Type PE 8CKT LMT MODULE 150027362 There are two converter modules to be fixed in the converter shelves provided Open the latch of the converter module Insert module into the respective slot...

Page 15: ...Alarm Module LEDs Condition Module OK LED Module Circuit LEDs2 1 8 Priority1 LED Circuit On G G Circuit OFF G OFF Circuit ON Overcurrent 3 Y Y Circuit Fail 1 R R Comm Fault Alarm Card 4 R BLINK Per c...

Page 16: ...dule Operations Manually Scan Circuit Loads Press and release the Button no interruption of power to ON circuits Manual Circuit ON OFF 1 Press and hold the Button to enter the manual mode hold until t...

Page 17: ...Change alarm descriptions via LAN port Web pages or Craft port EasyView2 when required Table 4 J1 Alarm Connections Table 5 J2 Alarm Connections Information Fault Detection Circuit ON Output is powere...

Page 18: ...com External Surge Protective Device SPD is required on all AC inputs Equipment and subassembly ports 1 are suitable for connection to intra building or unexposed wiring or cabling 2 can be connected...

Page 19: ...Page 19 2021 ABB All rights reserved Version 1 0 Version Date Description of the change 1 0 12 22 2021 Initial Release Change History excludes grammar clarifications QUICK START GUIDE...

Page 20: ...t any responsibility whatsoever for potential errors or possible lack of information in this document We reserve all rights in this document and in the subject matter and illustrations contained there...