2.4
Device casing
Only technicians authorized by the manufacturer are permitted to open the casing.
•
Never insert pointed objects (narrow screwdrivers, wires, etc.) into the device or into the connection
terminals for electric conductors. Do not touch the connection terminals.
•
Keep the ventilation slits free to ensure good air circulation.
3.4.4 Technical data on page 17
see ISP/S 8.1.1.1 IP-Swich PoE
3.5.4Technical data auf Seite 26
•
The installation position can be selected as required.
2.5
Qualification requirements for personnel
•
Only allow qualified personnel to work on the device.
Qualified personnel have the following characteristics:
•
Qualified personnel are properly trained. Training as well as practical knowledge and experience
make up their qualifications. This is the prerequisite for grounding and labeling circuits, devices, and
systems in accordance with current standards in safety technology.
•
Qualified personnel are aware of the dangers that exist in their work.
•
Qualified personnel are familiar with appropriate measures against these hazards in order to reduce
the risk for themselves and others.
•
Qualified personnel receive training on a regular basis.
2.6
National and international safety regulations
Verify that the electrical installation meets local or nationally applicable safety regulations.
2.7
Grounding the device
The device is grounded via a 6-pin terminal block.
•
Use a wire diameter for the ground conductor that is no smaller than the diameter of the supply
voltage connection, however of at least 0.5 mm² (AWG20).