![ABB IRT 710 Product Manual Download Page 186](http://html1.mh-extra.com/html/abb/irt-710/irt-710_product-manual_3759009186.webp)
4.3.2 Inspecting the lubrication system
Overview
If the track motion is equipped with an automatic lubrication system the level of
the lubricant should be checked according to the maintenance schedule (see
Maintenance schedule on page 181
), even if the system should apply the lubricant
equally over a longer period. The timer is only active when the system is in Auto
mode.
Location of lubrication system
The lubrication system is located as shown in the figure.
xx2200000633
Required equipment
Note
Art. no.
Equipment, etc.
These procedures include
references to the tools re-
quired.
Other tools and procedures
may be required. See refer-
ences to these procedures in
the step-by-step instructions
below.
Continues on next page
186
Product manual - IRT 710
3HKA00000186299-001 Revision: B
© Copyright 2023 ABB. All rights reserved.
4 Maintenance
4.3.2 Inspecting the lubrication system
Summary of Contents for IRT 710
Page 1: ...ROBOTICS Product manual IRT 710 ...
Page 14: ...This page is intentionally left blank ...
Page 58: ...This page is intentionally left blank ...
Page 84: ...This page is intentionally left blank ...
Page 360: ...This page is intentionally left blank ...
Page 364: ...This page is intentionally left blank ...
Page 378: ...This page is intentionally left blank ...
Page 380: ...This page is intentionally left blank ...
Page 383: ......