![ABB IRB 7600 Series Product Manual Download Page 111](http://html.mh-extra.com/html/abb/irb-7600-series/irb-7600-series_product-manual_5083111.webp)
2 Installation and commissioning
2.5.11. Installation of cooling fan for motors, axes 1-3 (option)
109
3HAC022033-001 Revision: K
©
Co
py
rig
h
t 200
4-
201
1 AB
B. All
ri
gh
ts reser
v
ed.
Installation, separate fan cabling axis 1 or 2
The procedure below details how to install the separate cabling for the cooling fan of axis 1
or 2.
Action
Note
1. Move the robot to its calibration position.
Shown in section
and correct axis position on page
406
.
2.
DANGER!
Turn off all electric power, hydraulic and pneumatic
pressure supplies to the robot!
Turn off all electric power and hydraulic but not the
air pressure to the gearboxes, motors and SMB.
3. Remove the
rear cover plate
from the robot base. Shown in the figure
.
4. Remove the cable bracket (A)
Shown in the figure
cabling for axis 1 or 2 on page 108
5. Fit the
plate for customer connections
, if not
already fitted, to the connection plate of the robot
base.
Shown in the figure
customer connections, at base on
page 107
Art. no. is specified in
.
6. Run the cabling up through the base and frame,
beneath the balancing device.
Continued
Continues on next page
工控帮助教小舒QQ2823408167
长沙工控帮教育科技有限公司