![ABB IRB 7600 - 150/3.5 Product Manual Download Page 227](http://html.mh-extra.com/html/abb/irb-7600-150-3-5/irb-7600-150-3-5_product-manual_5081227.webp)
4 Repair
4.3.1. Replacement of cable harness, axes 1-4
225
3HAC022033-001 Revision: E
©
Co
py
rig
h
t 200
4 - 20
08 ABB.
All r
ig
h
ts r
e
se
rv
ed
.
Refitting, cable harness, axes 1-4
The procedure below details how to refit the cable harness, axes 1-4.
12. Remove the cable gland securing the
cables to the arm house.
xx0100000143.wmf
13. Remove the
velcro strap
from the harness
at the cable fixing bracket at the arm house.
Shown in the figure
.
14. Disconnect
connector R2.M5/6
at the
cable division point.
Shown in the figure
!
15. Disconnect all connectors at motor 3 and
motor 4.
Specified and shown in the figure
!
16. Gently pull the cable harness out.
Action
Note
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots: Do not turn off the air
pressure to motors and SMB.
Continued
Continues on next page