If dissonance is detected...
Check for dissonance
from...
... perform maintenance according to given instructions
in Maintenance kit, complete.
•
piston rod (squeaking
may indicate worn
plain bearings, intern-
al contamination or
insufficient lubrica-
tion).
3
Art. no. for the kit and the documentation are specified
in section
Required equipment on page 151
Check for damage
Check for damages, such as scratches, general wear, uneven surfaces or incorrect
positions.
The check points are shown in the figure
Inspection points, balancing device on
.
If damage is detected...
Check for damage on...
... perform maintenance according to given
instructions in Maintenance kit, complete.
•
the piston rod (part of the piston
rod that is visible at the front of the
balancing device).
1
Art. no. for the kit and the documentation
are specified in section
...replace.
•
the securing screw in the front ear
shaft.
Also check the tightening torque (50 Nm).
2
Dimension is specified in section
.
Check for leakage
The front ear of the balancing device is lubricated with grease. After filling, excessive
grease may normally be forced out between the shaft and the sealing ring in the
sealing spacer. This is normal behaviour and must not be confused with incorrect
leaks from the ear.
Leaks at the o-rings and/or sealings, are not acceptable and must be attended to
immediately in order to avoid any damage to the bearing!
Continues on next page
152
Product manual - IRB 6650S
3HAC020993-001 Revision: Z
© Copyright 2004-2018 ABB. All rights reserved.
3 Maintenance
3.3.8 Inspecting the balancing device
Continued
Summary of Contents for IRB 6650S Series
Page 1: ...ROBOTICS Product manual IRB 6650S ...
Page 20: ...This page is intentionally left blank ...
Page 50: ...This page is intentionally left blank ...
Page 210: ...This page is intentionally left blank ...
Page 416: ...This page is intentionally left blank ...
Page 422: ...This page is intentionally left blank ...
Page 426: ...This page is intentionally left blank ...
Page 449: ......