4 Repair
4.3.6. Replacement of complete arm system
235
3HAC026876-001 Revision: C
© Copyri
ght
200
6-2008 ABB.
All rights reserved.
Required equipment
Removal, arm system
The procedure below details how to lift and remove the complete arm system.
Equipment, etc.
Art. no.
Note
Guide pins M12 x 130
3HAC022637-001
Used to guide the complete arm system
when refitting.
Always use the guide pins in pairs!
In order to make the refitting easier, it is
recommended to use two guide pins of
different lengths. Notice that longer
guide pins than 140 mm will not be
possible to remove from the frame
because lack of space after refitting!
Roundslings
-
Hoisting block
-
Used to adjust the length of the lifting
chain.
Standard toolkit
-
The content is defined in section
Other tools and procedures
may be required. See
references to these
procedures in the step-by-
step instructions below.
These procedures include references to
the tools required.
Action
Note
1. Make sure the robot is positioned as
shown in figure to the right. If it is not,
position it that way.
Release the brakes if necessary, as detailed
in section
Manually releasing the brakes on
.
xx0700000351
2.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
For Foundry Prime robots: Do not turn off
the air pressure to motors and SMB.
3. Drain the oil from gearbox axis 1.
.
Continued
Continues on next page