3.3.13 Inspection of air hoses (Foundry Prime)
Required equipment
Art. no.
Equipment, etc.
-
Leak detection spray
-
Pressure gauge
-
Cut off valve
Procedure
For this test it is recommended that the air supply to the robot has a pressure
gauge and a cut-off valve connected.
Note
Action
Recommended pressure:
Apply compressed air to the air connector on
robot base, and raise the pressure with the
knob until the correct value is shown on the
pressure gauge.
1
0.2-0.3 bar
It should take at least 5 seconds for the
pressure to reach 0 bar.
Close the cut off valve.
2
The time is < 5 seconds:
•
If the answer is
YES
: Localize the
leakage by following the procedures
below.
•
If the answer is
NO
: The system is OK.
Remove the leak testing equipment.
3
Pressurize by opening the cut off valve.
4
Spray suspected leak areas with leak detec-
tion spray.
Note
Bubbles indicate a leak.
5
When the leak is localized: correct the leak.
6
148
Product manual - IRB 6620
3HAC027151-001 Revision: T
© Copyright 2006-2018 ABB. All rights reserved.
3 Maintenance
3.3.13 Inspection of air hoses (Foundry Prime)
Summary of Contents for IRB 6620
Page 1: ...ROBOTICS Product manual IRB 6620 ...
Page 8: ...This page is intentionally left blank ...
Page 176: ...This page is intentionally left blank ...
Page 338: ...This page is intentionally left blank ...
Page 350: ...This page is intentionally left blank ...
Page 352: ...This page is intentionally left blank ...
Page 358: ......
Page 359: ......