![ABB IRB 5710 Product Manual Download Page 439](http://html.mh-extra.com/html/abb/irb-5710/irb-5710_product-manual_5054439.webp)
Note
Action
O-ring, NBR: 3HAB3772-150
(183.74x3.53).
Option Inverted (3317-1)
Replace the o-ring on the base with a new.
Lubricate with some grease and fit it in the
groove.
4
Grease, Shell Gadus S2: 3HAC042536-
001.
xx2100001195
Flange sealant: Loctite 574 (-).
xx2100001196
Option Inverted (3317-1)
Apply flange sealant to the mounting interface
on the base, outside of the groove.
5
Lifting adapter: 3HAC081565-001
Fit the lifting accessories in opposite holes
in the gearbox.
CAUTION
Leave a couple of millimeters of space
between the lug and the surface of the gear-
box. This is done in order not to damage the
surface of the gearbox which is a sealing
surface.
6
Lifting eye: 3HAC16131-1
xx2100002819
CAUTION
The weight of the gearbox is 97 kg
All lifting accessories used must be sized
accordingly.
7
Continues on next page
Product manual - IRB 5720
439
3HAC079195-001 Revision: A
© Copyright 2022 ABB. All rights reserved.
5 Repair
5.9.1 Replacing the axis-1 gearbox
Continued
Summary of Contents for IRB 5710
Page 1: ...ROBOTICS Product manual IRB 5720 ...
Page 8: ...This page is intentionally left blank ...
Page 14: ...This page is intentionally left blank ...
Page 36: ...This page is intentionally left blank ...
Page 186: ...This page is intentionally left blank ...
Page 580: ...This page is intentionally left blank ...
Page 604: ...This page is intentionally left blank ...
Page 609: ......