Required equipment
Note
Art no.
Equipment
For spare part no. see:
•
Upper link arm
Replace if damaged.
For spare part no. see:
•
Spherical roller bearing
(2 pcs)
3HAB3537-1
Bearing grease
Bearing puller with three legs.
Bearing puller
Loctite 243
3HAB7116-1
Locking liquid
Content is defined in section
.
-
Standard toolkit
These procedures include
references to the tools re-
quired.
Other tools and procedures
may be required. See refer-
ences to these procedures in
the step-by-step instructions
below.
Removing the upper link arm
Use this procedure to remove the upper link arm.
Note
Action
Check especially that it is possible to re-
move the locking washer at the link.
Put the robot in a position where it is possible
to reach all parts that shall be removed.
1
xx1000001132
Let the
tilthouse
rest on a workbench, on
some pallets or similar.
This is done in order to prevent the tilthouse
from falling downwards when the upper link
arm is removed.
CAUTION
In order to avoid accidents, also secure the
upper arm in an overhead crane.
2
Continues on next page
226
Product manual - IRB 460
3HAC039842-001 Revision: P
© Copyright 2012-2018 ABB. All rights reserved.
4 Repair
4.4.4 Replacing linkage - upper link arm
Continued
Summary of Contents for IRB 460 Series
Page 1: ...ROBOTICS Product manual IRB 460 ...
Page 8: ...This page is intentionally left blank ...
Page 16: ...This page is intentionally left blank ...
Page 46: ...This page is intentionally left blank ...
Page 96: ...This page is intentionally left blank ...
Page 138: ...This page is intentionally left blank ...
Page 346: ...This page is intentionally left blank ...
Page 370: ...This page is intentionally left blank ...
Page 374: ...This page is intentionally left blank ...
Page 390: ...This page is intentionally left blank ...
Page 396: ......
Page 397: ......