3.3.9 Spring units
General
This section describes maintenance on the spring units with the interval 500 hours.
DANGER
Turn off all electrical power, hydraulic and pneumatic pressure supplies before
entering the workspace of the manipulator.
Also read the safety sections:
•
Safety risks related to pneumatic/hydraulic systems on page 33
•
Risks associated with live electric parts on page 29
•
Safety risks during installation and service work on robots on page 23
CAUTION
The spring units must be removed according to the description in section
Replacement of parallel arms on page 174
or they will be damaged.
Check spring units
IRB 360 - 1/1130, IRB 360 - 3/1130, IRB 360 - 1/800, IRB 360 - 1/1600
A
B
C
G
xx0700000497
Hook
A
Spring
B
Rubber bellow
C
Greasing points
G
Continues on next page
120
Product manual - IRB 360
3HAC030005-001 Revision: U
© Copyright 2008-2018 ABB. All rights reserved.
3 Maintenance
3.3.9 Spring units
Summary of Contents for IRB 360 Series
Page 1: ...ROBOTICS Product manual IRB 360 ...
Page 8: ...This page is intentionally left blank ...
Page 46: ...This page is intentionally left blank ...
Page 156: ...This page is intentionally left blank ...
Page 236: ...This page is intentionally left blank ...
Page 258: ...This page is intentionally left blank ...
Page 276: ...This page is intentionally left blank ...
Page 278: ...This page is intentionally left blank ...
Page 283: ......