![ABB IRB 260 Product Manual Download Page 145](http://html.mh-extra.com/html/abb/irb-260/irb-260_product-manual_5037145.webp)
Note/Illustration
Action
Detailed in section
Remove the parallel bar.
4
CAUTION
The complete upper arm weighs 23 kg without
any additional equipment fitted! Use a suitable
lifting device to avoid injury to personnel!
5
xx0500002549
Fit the lifting equipment to the upper arm ac-
cording to the figure to the right.
6
xx0600002607
Remove the distance and the radial sealing
from the end shaft.
7
Art. no. is specified in
.
Untighten and remove the lock nut with the
extended KM nut
.
8
Remove the bearing.
9
Unfasten the shaft end by removing the
flanged bolts from inside the lower arm.
10
Remove the VK cover from the opposite side
by making a hole in the middle.
11
Be careful not to damage the parts under-
neath!
Untighten and remove the lock nut and the
bearing also from this side of the upper arm.
12
If necessary, use the
press tool, link
as a puller tool (fit the auxiliary shaft
to the upper arm shaft). Assembly of
the tool is shown in the figure
Unscrew the attachment screw and washer
and remove the end shaft from both sides.
13
Continues on next page
3HAC026048-001 Revision: E
145
© Copyright 2006-2013 ABB. All rights reserved.
4 Repair
4.4.3 Replacement of complete upper arm
Continued
Summary of Contents for IRB 260
Page 1: ...ABB Robotics Product manual IRB 260 ...
Page 8: ...This page is intentionally left blank ...
Page 52: ...This page is intentionally left blank ...
Page 110: ...This page is intentionally left blank ...
Page 206: ...This page is intentionally left blank ...
Page 214: ...This page is intentionally left blank ...
Page 216: ...This page is intentionally left blank ...
Page 260: ...This page is intentionally left blank ...
Page 266: ......
Page 267: ......