![ABB IRB 2400/10 Product Manual Download Page 67](http://html.mh-extra.com/html/abb/irb-2400-10/irb-2400-10_product-manual_5034067.webp)
3 Maintenance
3.1. Introduction
65
3HAC022031-001 Revision: C
©
Co
py
rig
h
t 200
4-
200
8 ABB. All righ
ts reser
v
ed.
3 Maintenance
3.1. Introduction
Structure of this chapter
This chapter details all maintenance activities recommended for the robot and any external
units of the robot.
It is based on the maintenance schedule, located in the beginning of the chapter. The schedule
contains information about required maintenance activities including intervals and refers to
procedures for the activities.
Each procedure contains all information required to perform the activity, that is, required
tools and materials.
The procedures are gathered in different sections and divided according to the maintenance
activity.
Safety information
Before any service work is commenced, it is extremely important that all safety information
is observed!
There are general safety aspects that must be read through, as well as more specific safety
information that describe danger and safety risks when performing the procedures. Read the
chapter
Summary of Contents for IRB 2400/10
Page 1: ...Product manual Articulated robot IRB 2400 L IRB 2400 10 IRB 2400 16 M2000 M2000A M2004 ...
Page 2: ......
Page 8: ...Table of Contents 6 3HAC022031 001 Revision C Copyright 2004 2008 ABB All rights reserved ...
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 198: ......
Page 199: ......
Page 202: ......
Page 203: ......
Page 205: ......
Page 226: ......