![ABB IRB 2400/10 Product Manual Download Page 114](http://html.mh-extra.com/html/abb/irb-2400-10/irb-2400-10_product-manual_5034114.webp)
4 Repair
4.5.2. Replacement of tie rod
3HAC022031-001 Revision: C
112
©
Co
py
rig
h
t 200
4-
200
8 ABB. All righ
ts reser
v
ed.
Removal, tie rod
The procedure below details how to remove the tie rod from the robot.
Refitting, tie rod
The procedure below details how to refit the tie rod to the robot.
Other tools and procedures
may be required. See
references to these
procedures in the step-by-
step instructions below.
These procedures include
references to the tools
required.
Equipment, etc.
Spare part no. Art. no.
Note
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
2.
CAUTION!
The complete upper arm weighs 23 kg without
any additional equipment fitted! Use a suitable
lifting device to avoid injury to personnel!
3. Use a crane to secure the weight of the upper
arm.
Shown in the figure
.
4. Remove the
attachment screw
from the upper
and lower end.
Shown in the figure
.
5. Remove the
locking washer
from both ends.
Shown in the figure
.
6. Insert a screw in the center of each end, to be
used as support.
M8
7. Use a puller to pull out the tie rod.
8. Remove the bearings and seals.
Shown in the figure
.
Action
Note
1.
DANGER!
Turn off all electric power, hydraulic and
pneumatic pressure supplies to the robot!
2. Make sure the weight of the upper arm is
properly secured.
Use a crane!
Continued
Continues on next page
Summary of Contents for IRB 2400/10
Page 1: ...Product manual Articulated robot IRB 2400 L IRB 2400 10 IRB 2400 16 M2000 M2000A M2004 ...
Page 2: ......
Page 8: ...Table of Contents 6 3HAC022031 001 Revision C Copyright 2004 2008 ABB All rights reserved ...
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 198: ......
Page 199: ......
Page 202: ......
Page 203: ......
Page 205: ......
Page 226: ......