3.4.2 Replacing the sealing set on tool flange of Hygienic robots
General
To ensure the sealing efficiency, sealing parts on the tool flange of Hygienic robots
is recommended to be replaced at an interval of 12 months or 60000 operating
hours.
Location of the sealing set
Parts of the sealing set on the tool flange of Hygienic robots are located as shown
in the figure.
xx2100001485
Recommended to replace at a 12-month interval.
Gasket, axis 6, Hygienic
A
Recommended to replace at a 12-month interval.
Seal ring unit
B
Replace if damaged.
Stainless shaft
C
Recommended to replace at a 12-month interval.
Sealing washer
D
Replace if damaged.
Stainless screws
E
Required spare parts
Note
The spare part numbers that are listed in the table can be out of date. See the
latest spare parts of the IRB 1200 via myABB Business Portal,
.
Continues on next page
144
Product manual - IRB 1200
3HAC046983-001 Revision: S
© Copyright 2014 - 2021 ABB. All rights reserved.
3 Maintenance
3.4.2 Replacing the sealing set on tool flange of Hygienic robots
Summary of Contents for IRB 1200
Page 1: ...ROBOTICS Product manual IRB 1200 ...
Page 156: ...This page is intentionally left blank ...
Page 896: ...This page is intentionally left blank ...
Page 898: ...This page is intentionally left blank ...
Page 905: ......