![ABB HVC-C 100-150 kW Installation Manual Download Page 26](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984026.webp)
2.3.12
Cable glands in the CCS control box
A
DC+ output cable to the next
control box
B DC+ input cable to the next
control box
C
DC- output cable to the next
control box
D
DC- input cable
E
Power supply feedback cable
F
Int DC guard input cable
G
Extrernal EMO button, beacon and
stop button
H
Ethernet input cable
J
PE from the power supply box
K
Auxiliary DC input cable
L
Ethernet output cable to the next
control box
M
Int DC guard output cable
to the next control box
N
Fiber optic input cable
O
Auxiliary DC output cable to the
next control box
P
CCS cable
Description
26
6AGA000007-0611-EN | 001
K
J
F
N
C
A
L
M
O
P
H
G
E
D
B