![ABB HVC-C 100-150 kW Installation Manual Download Page 25](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984025.webp)
2.3.11 Control box CCS, inside
A
Electronics compartment
C
Cover
D
DC power busbars
E
Cable glands
Part
Function
Electronics compartment To house electronic boards and DIN rail
Cover
To prevent unauthorized access to the ibusbars
DC power busbars
To connect DC power cables
Cable glands
Openings for the input and output cables
Description
A
D
C
E
6AGA000007-0611-EN | 001
25