![ABB HVC-C 100-150 kW Installation Manual Download Page 19](http://html.mh-extra.com/html/abb/hvc-c-100-150-kw/hvc-c-100-150-kw_installation-manual_2837984019.webp)
2.3.5
Overview of the power supply box, inside
A
D
C
B
C
A
DIN rail X1
B
DIN rail X2
C
Cable glands
D
Cable ducts
Part
Function
DIN rail X1
To connect these cables:
•
auxiliary AC input cable
•
auxiliary DC power cables
•
power supply feedback cables
DIN rail X2
To connect PE cables
Cable glands
Openings for the input and output cables
Cable duct
To guide the cables to the terminals
Description
6AGA000007-0611-EN | 001
19