Operation Manual / A130-M.. - A145-M..
9 Dismantling and fitting / 9.2 Material required
© Copyright 2021 ABB. All rights reserved.
HZTL4031_EN
Rev.N
March 2021
Starpoint ring nuts
Two ring nuts (M16) are required for safer lifting of the cartridge group, which are not in-
cluded in the ABB scope of delivery.
Fig. 38: Starpoint ring nut VRM
Lifting gear
WARNING
Suspended loads
Loads that are not attached according to regulations can cause injury to
personnel or fatal accidents.
u
Only fasten the turbocharger, assemblies or individual parts on properly
functional lifting gear with sufficient load limit.
u
Pay attention to the correct attachment of loads on the crane hook.
u
People must not stand beneath suspended loads.
Wear safety gloves to protect against mechanical hazards.
Wear safety helmet.
Definition of terms
¡
Suspension point
Defined loading point on a component or an assembly (blind hole thread, eyelet, lug).
¡
Assembly device
Devices that are fitted on the turbocharger in order to obtain a suspension point. As-
sembly devices are specially constructed and designed for the defined use; they are not
commercially available products. Use assembly devices only for the described applica-
tions.
¡
Lifting gear
Equipment for the lifting and transporting of loads (ropes, chain block, crane). Lifting
gear is not supplied by ABB.
Page
91
/
149